Scheduled Inspection Requests

These are the scheduled inspections.

You can save a copy by selecting all (Ctrl A) and paste into Excel (Ctrl V).

You can also print this page File > Print (Ctrl P).

Date
Time
Company
Inspection Type
Inspection Notes
QC Contact
QC Phone
Facility No
Location
Detailed Location
Assignee
Cancelled
04/08/2025
0200
J. Simmons Group, Inc.
Concrete Sampling
270+ cy D222202 4500psi
Victoria
2812212915
025 Site Civil
Site Civil
Waterworks Way
Kermit Thomas
04/07/2025
1050
J. Simmons Group, Inc.
Closed Form/Pour Card Inspection
Waterworks Way
Victoria
2812212915
025 Site Civil
Site Civil
Waterworks Way
Milind C
04/04/2025
0700
J. Simmons Group, Inc.
Concrete Sampling
150 cy D222202 4500psi
Victoria
2812212915
025 Site Civil
Site Civil
Road 9
Kermit Thomas
04/04/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/04/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/03/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/03/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/03/2025
1325
J. Simmons Group, Inc.
Closed Form/Pour Card Inspection
150 cy D222202 4500psi
Victoria
2812212915
025 Site Civil
Site Civil
Road 9
Milind C
04/02/2025
0700
J. Simmons Group, Inc.
Concrete Sampling
20 cy
Victoria
2812212915
025 Site Civil
Site Civil
504 N,202 E,273 E, 243 W
Kermit Thomas
04/02/2025
0730
Pepper Lawson - YP
Hydrostatic/Pneumatic Pressure Chlorine Residual Test
3x6 cd line exteiror pipe testing.
Arron Powell
346.831.5297
035 Site Yard Piping
Yard Piping
building 202 East
Kermit Thomas
04/02/2025
0730
Pepper Lawson - YP
Hydrostatic/Pneumatic Pressure Chlorine Residual Test
3x6 cd exterior pneumatic
arron powell
346.831.5297
035 Site Yard Piping
Yard Piping
202 east
Kermit Thomas
04/02/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC in main room
mhoy
281-865-8418
202 Chloride Dioxide Facility 2
North Plant
Inside pump room
Milind C
04/02/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/02/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/02/2025
0830
Balfour Beatty
Water Tightness/Static Head/Leak
Visual leak test for the Hydrochloric Acid Tank (202HCLTNK71100) -initials reading test for 24 hour
Saif
8323357393
202 Chloride Dioxide Facility 2
North Plant
202 Northeast containment
Oznel G
04/02/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Prep and touch up paint Center column and influent wall
mhoy
281-865-8418
503 Gravity Sludge Thickener Complex 3
North Plant
GT-6
Oznel G
04/02/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PPW piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
North road
Oznel G
04/02/2025
0900
National Fence
Concrete Sampling
same mix as before
Kermit
not sure
402 HSPS 2
South Plant
Concrete Swale on the South side of complex
Kermit Thomas
04/02/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PPW piping
mhoy
281-865-8418
217 Pretreatment Chemical Facility 7
North Plant
north road
Oznel G
04/02/2025
0930
Balfour Beatty
Visual Inspection - Add Notes
Paint 78" piping
mhoy
281-865-8418
223 Rapid Mix Train 3
North Plant
North vault
Oznel G
04/02/2025
0945
HWT
Visual surface prep/Conditions verification
Inspection of surface prep and verification of conditions for coatings applications.
Oznel Garza
956-240-5304
401 High Service Pump Station 1
South Plant
Inside and Southside of HSPS
Oznel G
04/02/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Continue to touch up holidays.
mhoy
281-865-8418
503 Gravity Sludge Thickener Complex 3
North Plant
GT-5
Milind C
04/02/2025
1030
Balfour Beatty
Visual Inspection - Add Notes
Paint CRCY piping
mhoy
281-865-8418
612 Liquid Residuals Clarifier Facility 2
North Plant
North side
Milind C
04/02/2025
1100
Balfour Beatty
Hydrostatic/Pneumatic Pressure Chlorine Residual Test
Pneumatic test for 3X6 PC1 line ( testing the outer pipe) - test for 2 hours
Saif
832-335-7393
215 Pretreatment Chemical Facility 5
North Plant
215
Oznel G
04/02/2025
1300
Balfour Beatty
Holiday
Holiday test touch ups
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-8
Oznel G
04/02/2025
1330
Balfour Beatty
Visual Inspection - Add Notes
Start touch up on center column and influent wall
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-7
Milind C
04/02/2025
1400
Balfour Beatty
Closed Form/Pour Card Inspection
Reinforcing Steel, Waterstop, Concrete Forms
Zach R
8329752802
202 Chloride Dioxide Facility 2
North Plant
202 - Exterior Sidewalk Trench
Kermit T
04/01/2025
0800
Harper Bros
Visual Inspection - Add Notes
FINAL WALKTHRU EAST SIDE 66" RWL
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/01/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
Welding 66" RWL
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/01/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
Compaction on 66" RWL
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
04/01/2025
0930
Fisk
Electrical Equipment Torquing
Torque Pole Lights
Warren Davis
832-373-5796
045 Site Electrical
Site Electrical / I&C / Security
South road at the bend
Robert J
03/28/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
Final Grout Inspection at Removed 108" Plugs
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
Damon O
03/28/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Weld Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/28/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" RWL Densities
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
Damon O
03/27/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Weld Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/27/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" RWL Densities
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/26/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
66" RWL Densities
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/26/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Weld Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/26/2025
1300
Balfour Beatty
Visual Inspection - Add Notes
Surface prep on 78"
mhoy
281-865-8418
223 Rapid Mix Train 3
North Plant
North Vault
Damon O
03/25/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
66" Weld Inspection
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/19/2025
1300
Balfour Beatty
Visual Inspection - Add Notes
Basin Walk
Poonam
8329779803
503 Gravity Sludge Thickener Complex 3
North Plant
503 USDS
03/14/2025
10
Industrial TX
Visual (VT)/CWI Inspection
Finish coat on the concrete barrier bollards - All day
Edwin P
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
03/14/2025
10
Industrial TX
Drilling/Doweling/Epoxy/Pull Test
Drilling min 6" for Bollards / Epoxy and SS 7/8" threaded bolts
Edwin P
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
03/13/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Basin inspection
Poonam
832-335-7393
504 Gravity Sludge Thickener Complex 4
North Plant
504 USDS
03/13/2025
9
Industrial TX
Visual (VT)/CWI Inspection
Concrete barrier bollards - Continue putting the first coat on them - All day long
Edwin Pena
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
Damon O
03/10/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
612 Basin inspection
Poonam
8329779803
612 Liquid Residuals Clarifier Facility 2
North Plant
612 Clarifed Recycle Pump Station
Damon O
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #8 ( final)
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #8 (Final)
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/26/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/26/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/25/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint 24" ductile
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
North side at USDS
02/25/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint ductile
mhoy
281-865-8418
802 Basin Drain Pump Station 2
North Plant
Inside
02/25/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
202 Chloride Dioxide Facility 2
North Plant
Inside building main room
02/25/2025
0930
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Inside main room
02/25/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Deficiency Tracker Item - J Hook Sealant Fix
Zach R
8329752802
218 Pretreatment Chemical Facility 8
North Plant
218 - PC Tanks
02/25/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Final paint inspection on PPW piping before piping gets insulated.
mhoy
281-865-8418
217 Pretreatment Chemical Facility 7
North Plant
North road
02/25/2025
1030
Balfour Beatty
Visual Inspection - Add Notes
Paint PEN line
mhoy
281-865-8418
243 Flocculation and Sedimentation Train 3
North Plant
Rooftop
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Paint PEN line
mhoy
281-865-4818
244 Flocculation and Sedimentation Train 4
North Plant
Roof top
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #6
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #6
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/25/2025
1130
Balfour Beatty
Visual Inspection - Add Notes
Paint 8" CDS on roof top
mhoy
281-865-8418
223 Rapid Mix Train 3
North Plant
Roof top
02/25/2025
900
HWT
Visual Inspection - Add Notes
Coating inside valve box
Abdul Masoom
N/A
251 Ozone Contractor 1
North Plant
South side valve box
02/25/2025
900
HWT
Visual Inspection - Add Notes
Coating inspections of bellows
Abdul Masoom
N/A
402 HSPS 2
South Plant
402 Bellows South side exterior
02/24/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint ductile piping.
mhoy
281-865-8418
802 Basin Drain Pump Station 2
North Plant
Inside
02/24/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint carbon Steel piping.
mhoy
281-865-8418
262 Ozone Generation Facility 2
North Plant
Main room
02/24/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Repair 1 holiday
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-8
02/24/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Main room
02/24/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #5
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/24/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #5
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/22/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint carbon steel piping
mhoy
281-865-8418
262 Ozone Generation Facility 2
North Plant
Inside main room
02/22/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Inside main room
02/22/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #3
Mike
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/22/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #3
Mike
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/13/2025
0500
J. Simmons Group, Inc.
Concrete Sampling
Road 9 and pour back demo at 221/D222202 7" slump
Victoria
2812212915
025 Site Civil
Site Civil
Road 9 and pour back demo at 221
02/12/2025
1550
J. Simmons Group, Inc.
Closed Form/Pour Card Inspection
Road 9 and pour back demo at 221
Victoria
2812212915
025 Site Civil
Site Civil
Road 9 and pour back demo at 221
02/07/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Visual inspection for Basin 6
Poonam
8329779803
243 Flocculation and Sedimentation Train 3
North Plant
243 basin #6
02/06/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint PDR piping inside
mhoy
281-865-8418
253 Ozone Contractor 3
North Plant
Roof top
Oznel
02/05/2025
11.00
Pepper Lawson - YP
Closed Form/Pour Card Inspection
none
Troy Continenetal
979-777-1979
035 Site Yard Piping
Yard Piping
road-trench mow strip pond 8-9
02/05/2025
14.00
Pepper Lawson - YP
Concrete Sampling
none
Troy Continental
979-777-1979
035 Site Yard Piping
Yard Piping
road-mow strip trench pond 8-9
08/30/2024
1000
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish
Zach R
832.975.2802
254 Ozone Contractor 4
North Plant
254 - South Exterior Wall
Dan N
08/09/2024
1300
Balfour Beatty
Electrical 4 - Ground Resistance/High Potential
resistance test.
Warren Davis
832-373-5796
215 Pretreatment Chemical Facility 5
North Plant
North West corner of 215
Robert J
07/20/2024
1000
Balfour Beatty
Water Tightness/Static Head/Leak
NO INSPECTION - Leak test day #3 (SOAK)
Saif
8323357393
802 Basin Drain Pump Station 2
North Plant
802
07/19/2024
1000
Balfour Beatty
Water Tightness/Static Head/Leak
NO INSPECTION - Leak test day #2 (SOAK)
Saif
8323357393
802 Basin Drain Pump Station 2
North Plant
802
07/19/2024
1100
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish
Zach R
8329752802
244 Flocculation and Sedimentation Train 4
North Plant
244 - Basin 8 Floc Basin: North Interior
Larry C
07/18/2024
0900
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish Sign Off
Zach R
832.975.2802
244 Flocculation and Sedimentation Train 4
North Plant
244 - Basin 8 Floc: North Interior Wall
Dan N